MY Name is Ejaz ur Rahman,I have done my bachelor in engineering in electrical branch from Usman Institute of technology Karachi with CGPA 3.29/4. I have deep knowledge regarding electrical engineering and all its aspects. My co-op placement gave me an opportunity to participate in in the design, development, and implementation of several engineering projects. I have knowledge of the latest technology and skills in design and applicationsof electrical theory. I am able to coordinate machine and equipment installations, providing troubleshooting and other technical assistance. I can do research and testing, develop protocols an that streamline the process and accelerate product release while cutting production time and costs.
I am a well organized person, with excellent knowledge about the subject, able to do multitasking, able to handle a team and have excellent communication skills. As a good manager and excellent team player I can handle the responsibilities and challenges of the post of an electrical engineer to its fullest.
Working as Maintenance Engineer in Pakistan International Airline(PIA) from Universal Fire Protection.
Roles:
-Representative from third Party in PIA.
-Inspection and Maintenance of Fire Alarm detection System Which included 24 different sites.
-Inspection and Maintenance of Fire Fighting System. ie Fm200
-Supervision in installation of equipments on sites, configuration and integration.
Share Progress report with Manager
Strategic Planning for upcoming projects
Help coordinate and manage project from inception to completion
Organize, file, and maintain all current project documents
Maintain positive vendor and client relationships.
Working as Engineer at WAJDACOM with ZTE on different projects in Punjab regions
and provide Technical support for team on site and resolve technical issues at sites working with different Telecom Operators and Venders
Project Name: Cmpak 4G/3G & power swap Project:
Supervision of installation 4G sites and configuration and integration of SDR System ZTE.
Coordination with teams for Resolve different Technical issues.
Coordinates with Customer related different Technical and non Technical issues.
Share Progress report with Project Manager and Director.
Perform power swap ZXDU68 W301
Perform PAT of sites With Customer.
Project Name: Telenor (2G and 3G) Rollout Project:
Installation and Commissioning of ZTE BTS ZXSDR 8910.
Commissioning of RRUs 8861 and 8862 (Radio Remote Unit).
Commissioning of BBU (Base Band Unit) card.
Commission of CC (Control Card),FS3 (Fiber Switch),UBPG and BPK Card used for 3G.
Off Line Commissioning.
Alarms Patching and Verification from BSC.
Perform ATP With Customer.
Resolving sector issues and Quality issues timely.
Project Title :PIR Based monitoring system Role: Team Leader 15th July 2015 to 23 May 2016
Project Description: The system is fully automated which reduces the human intervention. The main contribution through this project is to save the power Consumption and memory space of Recording System.
Extensive Learning: Leading the team under pressurize conditions with keeping Planning, Scheduling, Tracking, Coordination and Proper Execution in mind.